Timeless Floor Designs logo
Call NowFree Estimate

Services

What we install,
and how.

Five scopes of work, each done to the same standard — from tear-out and subfloor prep to the last baseboard coped to the floor.

Luxury Vinyl & Laminate — installed by Timeless Floor Designs
01

Luxury Vinyl & Laminate

Waterproof plank flooring clicked into place with tight, staggered seams.

  • Luxury vinyl plank (LVP) and laminate in wood-look and stone-look finishes
  • Click-lock installation with staggered end joints for a natural board pattern
  • Waterproof and pet-friendly options for kitchens, baths, and whole homes
  • Transitions, thresholds, and quarter-round finished to match
Engineered & Solid Hardwood — installed by Timeless Floor Designs
02

Engineered & Solid Hardwood

Wide-plank hardwood nailed or glued to a prepared, leveled subfloor.

  • Engineered hardwood for stability over concrete and in Arizona's dry climate
  • Solid hardwood nail-down installation over wood subfloors
  • Staggered plank layout with consistent seam offsets
  • Matching stair treads, risers, and baseboards to tie the floor together
Custom Shower Tile — installed by Timeless Floor Designs
03

Custom Shower Tile

Custom tile shower pans and walls built to slope, drain, and stay sealed.

  • Large-format porcelain and natural stone shower walls, floor to ceiling
  • Properly sloped mortar pan and waterproofing membrane behind the tile
  • Niche, bench, and curb detailing finished cleanly
  • Grout sealed and fixtures set to a weathertight finish
Stairs & Baseboards — installed by Timeless Floor Designs
04

Stairs & Baseboards

Finish carpentry that makes the floor look planned, not patched on.

  • Hardwood-wrapped stair treads and risers, mitered at returns
  • Newel and railing coordination with the flooring plane
  • Baseboard and shoe molding cut and coped to the floor
  • Transition strips between material changes, matched to the floor tone
Demo & Subfloor Prep — installed by Timeless Floor Designs
05

Demo & Subfloor Prep

Tear-out and subfloor flattening before a single new plank goes down.

  • Removal of old carpet, vinyl, and hardwood down to the slab
  • Subfloor patching and self-leveling to a flat tolerance
  • Moisture testing on concrete before glue-down or floating installs
  • Haul-off and jobsite cleanup at the end of each day

Not sure which material fits your home?

We walk the space with you and call it honestly. Serving Phoenix, Peoria, Scottsdale, Anthem and the rest of the Valley.

Get a Free Estimate